 |
 |
Turbo Test
Challenge
In this extremely time-sensitive test program, each store needed to receive different signs each week over a three-month period. The project demanded very short lead times and shipments of site-specific kit components.
Solution
All print components were produced via direct output to accommodate the short lead time. Color control was ensured with frequent press checks and on-line color comparison.
Results
Performance Display produced and shipped more than 13,500 components in three months with lead times as short as five days from artwork handoff to delivery. Multiple drop shipments were sent directly to 42 stores, each having its own unique pick-list, and delivered on time.
|